Three Reasons to
VALUE Construction Method utilizes the characteristics of Miracle Primer to achieve waterproof and rust-free effects.
Miracle Primer, with super high water solubility, can penetrate along cracks thinner than a hair and reach the deepest layer of concrete structures with a capillary action to block, consolidate and strengthen the cracks with its high viscosity after drying.
VALUE Construction Method is designed for areas with oil or water (such as restaurant kitchens). It dries quickly with the application of quick-drying agent, greatly shortening construction time and reducing the impact on facility users.
Low cost leading to short construction period
The construction period can be shortened by shortening the rust removal and oil film removal work . As a result, the cost can be kept low.
Penetrate and stop reliably
“Miracle Primer” penetrates deep into concrete and securely closes cracks that cause water leakage .
Blocks air to prevent corrosion
By forming a flexible and strong coating film , it blocks “moisture” and “air” that cause rust. It surely stops the progress of rust and corrosion.
VALUE
Construction Method”
Trivial building aging problems, uncertain needs to be repaired, aging progress is cumulatively repaired, immediate construction, free of inspection and difficult, high construction period, long construction period. But with the new construction method, the cost can be drastically reduced, and the construction period can be shortened, which is the VALUE construction method.
Effective
Construction Site
Water leakage in the elevator trough Corrosion prevention of steel bars
Using our company’s Miracle Primer for daily maintenance, not only can effectively stop leakage, but also prevent rust and reduce the aging rate of equipment to a minimum
Tried ordinary waterproofing works twice in the past and has not stopped water leakage. With the construction method, the water leakage will stop immediately.
Repair of multi-storey car park pallets
The water leakage caused by the cracks in the underground floor has corroded the bottom platform of the elevator for many years, resulting in failure to pass the statutory safety inspection, and the replacement cost of equipment exceeded 10 million yen (700,000 Hong Kong dollars, and did not solve the fundamental problem).
After using the construction method, stop the water seepage problem, and then apply the surface coating. The synthetic branch components in Miracle Primer can effectively prevent the deterioration of rust without the need to replace equipment. The construction takes only four days and the cost is only 1.2 million yen (84,000 Hong Kong dollars). Three years have passed since the construction, and there is no water leakage problem at all.
Repair of cracks caused by the installation of solar power panels
The cracks of the glass glue on the brackets of the solar power panels will cause water leakage. The construction method does not need to re-install the brackets, allowing the Miracle Primer to penetrate deeply into the cracks, plug the cracks, and solidify and strengthen. Prevent water leakage.
Roof or exterior wall tile solution Hollow water, leaking
If the tiles appear hollow, the tiles are usually removed as shown in the picture on the left. Later, the tiles that are reinstalled may not find the same style.
Construction method Just drill a hole on the surface and inject Miracle Primer to fill the hollow and solidify and strengthen the hollow ceramic tile. The surface is then coated with an anti-UV coating.
Observing the leaking part from the inside, the injected Miracle Primer oozes out on the inner wall surface, and after drying, it blocks the leaking cracks and stops the leaking.
If the tiles appear hollow, the tiles are usually removed as shown in the picture on the left. Later, the tiles that are reinstalled may not find the same style.
Construction method Just drill a hole on the surface and inject Miracle Primer to fill the hollow and solidify and strengthen the hollow ceramic tile. The surface is then coated with an anti-UV coating.
Corrosion prevention of buildings and metal parts
Even if there is rust, the tight adhesion properties block air and water Effectively and continuously prevent oxidation.
There is no need to remove rust thoroughly, reducing time and cost.
Concrete cracks are strengthened by deep penetration and solidification with Miracle Primer.
There are often iron stairs in the house, which are plagued by corrosion. Miracle Primer can effectively solve the problem.
When it rains, there are many cracks on the parking lot slope and water leaks in many places. Inject Miracle Primer into the cracked part to repair the crack.
Re-bond the parking lot stone barge. If the waterproof layer around the stone barge has floated, you can cut the waterproof layer to bond the waterproof layer together.
The main benefits of Miracle Primer
- The value construction method shortens the construction period.
- By penetrating the material and making the skeleton itself a waterproof layer, water leakage is surely stopped.
- It also completely closes small cracks that may cause water leaks.
- It shuts off air and water to stop the progress of rust.
- Since it is environmentally friendly and has no odor, it reduces the burden on customers, neighbors, and contractors.
- It makes it possible to extend the life of the building and reduce the total cost.